Following both repeated emergency deviations from Experimental Program Test 7 operations to protect endangered species and high level consultation among various agencies, the Corps implements the Interim Structural and Operational Plan (ISOP), as an Emergency Deviation from Test Iteration 7 of the Experimental Program to protect the Cape Sable seaside sparrow.
Interim Structural and Operational Plan
Leave a Comment
Posted: January 2, 2018 by Everglades Law
Following both repeated emergency deviations from Experimental Program Test 7 operations to protect endangered species and high level consultation among various agencies, the Corps implements the Interim Structural and Operational Plan (ISOP), as an Emergency Deviation from Test Iteration 7 of the Experimental Program to protect the Cape Sable seaside sparrow.