331 W. Central Ave. Ste. 213, Winter Haven, FL 33880 contact@evergladeslaw.org 863-298-8000

The General Design Memorandum (GDM) for “Modified Water Deliveries to Everglades National Park

The Corps finalizes the GDM, a plan — required by the 1989 Everglades National Park Protection and Expansion Act — to modify operations of the C&SF Project with a rainfall driven schedule, along with some structural modifications.

Go Back